A 1,400 kW Motor for the Queiq River Irrigation Project
The Queiq River, also known as the Aleppo River and recorded in antiquity as the Belus (Greek: Βήλος), flows through Aleppo in northern Syria. For generations, it supplied water to the city and to farmland in the surrounding plains. Its flow declined sharply during the twentieth century, and in 2006 Syria began a project to bring water from the Euphrates into the Queiq.
Restoring an irrigation pumping station
Valiadis Hellenic Motors is contributing to the restoration of a pumping station that serves irrigation along the Queiq. We have completed and delivered the first medium voltage electric motor for the station, with further motors to follow.
The motor was developed through reverse engineering for the existing installation. In a restoration project of this kind, the replacement motor has to meet the electrical and mechanical requirements of the pumping equipment. Its output, supply voltage, speed and mounting arrangement all matter when fitting it into the station.
The first motor
The first motor delivered, a six-pole TMKHV630-6, has a rated output of 1,400 kW and operates on a 6 kV, 50 Hz supply. It features B3 mounting, IC611 cooling and IP55 enclosure protection.
The B3 arrangement provides for horizontal, foot-mounted installation. The IC611 cooling system uses an air-to-air heat exchanger to remove heat without drawing outside air through the motor interior. The IP55 enclosure provides protection against dust ingress in harmful quantities and against water jets.